Business2 June 2026 at 04:47 pmQuick read
Mumbai-Ahmedabad Bullet Train Sees Tunnel Breakthrough
Credibility score70 / 100
LowModerateHigh
2sources verified
A 417-metre tunnel has been excavated in Palghar. The tunnel is 14.4 metres wide. This is a milestone for the Mumbai-Ahmedabad bullet train project.